Bridge for transport of wind turbines

Our client Implenia Norge AS needed a temporary bridge for the transport of wind turbines into a local area, project Fløytdammen. They need to transport, hoist and assemble towers, turbines and transformers.

Janson Bridging has provided a temporary bridge to get the transports across a dam in a rural area near Bruvoll, Norway.

 

 

 

 

 

 

 

 

 

The bridge elements left Hank, the Netherlands on monday June 22 and arrived on site on time at Wednesday morning June 24.

A 200 ton crane was needed to unload and install the elements due to the limited access and working space.

Deel op:

Projectdetails

Oplossing
Balkbrug
Type
JSK
Totale lengte brug
15,7 mtr
Breedte van de weg
4,2 mtr
Hoogte
0,45 mtr
Eigen gewicht
38 Tons
Type verkeer
Construction Traffic
Balkbrug

Uitgelicht

Project

The Norwegian Airport at Gardermoen had to create a temporary bypass to keep the traffic from and to the Arrivals going, when reconstructing a concret...
Balkbrug (JSK)
Oplossing

Balkbrug (JSK)

Jansons balkbruggen (JSK) zijn ontworpen voor een relatief korte vrije overspanning tot maximaal 21 meter. De balkbrug wordt vaak ingezet als tijdelij...