As part of the logistics operation carried out by UTC Overseas for the delivery of transformers weighing 354t and shunt reactors weighing 135t from Gdynia to Osiek Lęborskie, the JSK450 beam bridge was used to increase the parameters of the existing crossing in Żarnowiec (Pomeranian Voivodeship) as a bridge above the existing bridge (so-called flyover). The crossing, 35m long (with ramps) and 5.7m wide, was completed in just 3 hours.
Projectdetails
Oplossing
Balkbrug
Type
JSK-JBB
Lengte
35m
Breedte
5,7m
Belasting
Special vehicle c.400t, local public traffic
Uitgelicht
Project
To unload oversized cargo - transformers weighing several hundred tons - in the port of Władysławowo, our Client decided to use a JSK system bridge wi...