Temporary Ro-Ro platform

To support the transport of tanks weighing 400 tons each from Gdynia to Szczecin, our client decided to use a temporary bridge of the JSK system as a Ro-Ro platform. In this way, the time of the entire operation was reduced to a minimum and part of the quay was protected against damage.

Deel op:

Projectdetails

Oplossing
Balkbrug
Type
JSK-JBB
Lengte
35m
Breedte
11,4m
Balkbrug

Uitgelicht

Project

As part of the logistics operation carried out by UTC Overseas for the delivery of transformers weighing 354t and shunt reactors weighing 135t from Gd...
Balkbrug (JSK-JBB)
Oplossing

Balkbrug (JSK-JBB)

Jansons balkbruggen (JSK) zijn ontworpen voor een relatief korte vrije overspanning tot maximaal 21 meter. De balkbrug wordt vaak ingezet als tijdelij...