Gardermoen Airport Bridge

The Norwegian Airport at Gardermoen had to create a temporary bypass to keep the traffic from and to the Arrivals going, when reconstructing a concrete fly-over.

For the Norwegian Statens Vegvesen, we have installed a temporary bridge in one of the supply roads to the airport terminal in the Norwegian capital Oslo.

 

Janson Bridging has supplied 10 elements 21 meters long and 2.1 meters wide for this site, including a specially made triangular corner element. Janson Bridging took care of the design of the superstructure, the pre-assembly and the transport. Statens Vegvesen installed the bridge.

 

Deel op:

Projectdetails

Oplossing
Balkbrug
Type
JSK
Oplossing
Traffic bridge
Totale lengte brug
105 m
Breedte van de weg
4,2 m
Eigen gewicht
250 tn
Aantal overspanningen
5
Installatiedatum
December 2014
Demontage datum
September 2015
Lengte brug
5 x 21 m
Balkbrug

Uitgelicht

Balkbrug (JSK)
Oplossing

Balkbrug (JSK)

Jansons balkbruggen (JSK) zijn ontworpen voor een relatief korte vrije overspanning tot maximaal 21 meter. De balkbrug wordt vaak ingezet als tijdelij...